Close

Login

Close

Register

Close

Lost Password

Select Lectures – Software Project Management

Select Lectures - Product & Process

The Software Project Management module set. This module set comprises three video modules. Each module is shipped on a single DVD for viewing on a computer only

Aspects of Project Management

In this module we will look at aspects of project management, aiming to make your software projects successful.

Duration: 1 hour 57 minutes
Price: $99
Order Code: SBS-VBT-04

We Will Look At

How to start a project

A good project needs to start from firm foundations. Effort put in at this stage will reap big dividends.

Mobilise your workers

The people working on the project are the only people that will make it a success or not.

Plan your project

project planning is a straightforward technical discipline, and there are good tools to help you do it.

How to monitor your project

Having made good plans, the project manager needs to monitor how the work is progressing against the plan. Only by keeping on top of the game, will you be able to spot and act when the plan is not working out as expected.

When something goes wrong

In all projects it is inevitable that something will go wrong. It’s a project managers skill to spot something going wrong early on, and to react to it in the right way.

Software Project Planning

In these sessions we guide you through the contemporary approach to planning software projects.
We start with discussing the realities that every development project faces, then detail the principles to apply when planning your projects. In the planning increments session we outline the process to follow and use a medium-sized project to give examples of the types of issues that you may face.
Very large scale projects produce their own problems which we will cover in the last session.

Duration: 1 hour 48 minutes
Price: $99
Order Code: SBS-VBT-05

Project Scheduling and Tracking

Having selected an appropriate process model, identified the software engineering tasks that have to be performed, estimated the amount of work and the number of people, know the deadline, and considered the risks.
Now it’s time to connect the dots. That is, to create a network of software engineering tasks that will enable the job to be done on time.
Once the network is created, assign responsibility for each task, make sure it gets done, and adapt the network as risks become reality.
In a nutshell, that’s software project scheduling and tracking.

Duration: 4 hours 36 minutes
Price: $224
Order Code: SBS-VBT-07

Throughout this video module we will discuss these activities

Task Definition identifier

Task Definition identifies the specific tasks that must be performed to produce the various software work products.

Documents Dependencies

Task Sequencing identifies and documents dependencies between tasks, and considers those tasks that can be conducted in parallel

Task Effort Estimating

Task Effort Estimating determines the projected human effort that will be expended to complete each task

Task Duration Estimating

Task Duration Estimating determines the number of work periods (e.g., calendar weeks) that will be needed to complete individual tasks.

Schedule Development

Schedule Development analyzes task sequences, task durations, and resource availability and creates both macroscopic and detailed project schedules

Schedule Control

Schedule Control manages changes to the project schedule.

Schedule Tracking

Schedule Tracking analyzes progress against the schedule and reports deviations

Duration: 1 hour 51 minutes
Price: $99
Order Code: SBS-VBT-06

Risk Management

Risk Management is an integral and essential part of Project Management which recognises the possibility that unexpected events may affect the intended objectives of a project or programme. The systematic identification and management of risks addresses this and, through analysis, provides a picture of the likelihood of project success.
The Risk Management process helps us to identify potential unacceptable cost increases, time delays or shortfalls in performance, and, by recognising what action can be taken to influence the causes and/or consequences of the risks, seeks to maintain the balance between customer expectations (the Demand) and the preferred solution (the Supply).

IDENTIFY

ANALYSE

PLAN

MANAGE

Select Lectures - DVD Technical Requirements

The Select Lectures on Software Engineering have been designed for viewing on a computer with sound support. Computer requirements are:
  • DVD drive
  • Web Browser: Internet Explorer, Firefox, Safari, Google Chrome Adobe Flash plugin may be required on some browsers.
Other formats can be made available. Please contact us with your requriements.